Interconnection Process

Solar Panels2

Customer Owned Generation Facility Interconnection Process


Introduction

This process and accompanying guidelines have been developed by the City of Groton Department of Utilities, Electric Division (GU) or (Division) to assist Customers wishing to generate power and to interconnect with the Division’s Electric Power System (EPS). 

GU Electric Division is responsible for the distribution of electric power throughout the City of Groton and portions of the Town of Groton, Connecticut. GU must ensure that any interconnections to the EPS are performed in a safe and reliable fashion. To this end, protocols and procedures are outlined in this Guideline document. 

These Guidelines provide a means for the Customer and GU to work together toward the common goal of a successful interconnection. In working together, GU is always willing to consider case specific exemptions to the Guidelines due to changes of applicable regulations, advances in technology, etc.

Interconnection Guidelines

Interconnection Application Forms

Based on the size and scope of your specific proposed customer owned generation facility,  GU has developed multiple Interconnection Applications to meet the needs of our customers.  Here is the list of applications sorted by generation size:Based on the size and scope of your specific proposed customer owned generation facility,  GU has developed multiple Interconnection Applications to meet the needs of our customers.  Here is the list of applications sorted by generation size:

In addition to the application, the following will be required in submittal of a complete Application:In addition to the application, the following will be required in submittal of a complete Application:

  • Completed Cat 1 or 2-5 application
  • One-Line Diagram
  • Site Plan
  • Construction Schedule
  • Tech Specs
  • Application Fee
  • Estimated annual production

How to Apply

In order to apply for an interconnection with Groton Utilities electric power system fill out the form below completely. Once submitted the appropriate division will review the application. Upon completion of review you will be contacted by Groton Utilities with a determination for the next steps in the process.

Interconnection Application

  1. Contractor Information
  2. Upload Interconnection Application, One-Line Diagram, Site Plan, Construction Schedule and Technical specifications, and recent electric bill. Maximum of 5 documents. Maximum of 20MB combined documents size. Submissions over 20MB will not be processed. Scan documents rather than take a picture to minimize file size.